E-mail: btxianfa@gmail.com TEL:0086-317-8267555 FAX: 0086-317-8267570 MOB:0086-15131786129

 
roll forming machine Sitemaps
HB NEWS

 

Floor Deck roll forming machine

time:2011-07-24 08:03from:未知 Author:admin click:Times

Specifications 1.Floor Deck roll forming machine 2.CE CERTIFICATE 3.High speed Decking Roll Forming Machine 4.Easy operating Floor Deck roll forming machine Main technical parameter 1.manual decoile:rmanual expanding,passive u


 Specifications

1.Floor Deck roll forming machine 
2.CE CERTIFICATE 
3.High speed Decking Roll Forming Machine 
4.Easy operating
Floor Deck roll forming machine
 
Main technical parameter
1.manual decoile:rmanual expanding,passive uncoilRoll former
 Inner Diameter. Φ460-520mm
 Outer Diameter. Φ1400mm
2.weight capacity of decoiler:10T                      
3.machine stand: welded  shape steel
4.type of forming machine:wallboard type with chain transmission
5.diameter of shaft: 80mm
6.material of shaft: high-grade 45 steelForming machine |
7.chain:20A
8.motor power of forming machine:11KW*2
9.forming speed:10-15m/min
10. roll station:30 stations
11. material of roller :high-grade 45 steel
12. surface of roller coated with chrome 0.05mm thickness
13. motor of hydraulic station:3KWRoll former |  
14. hydraulic oil pump:bear pump CB-E314
15. type of cutting:hydraulic cutting
16. material of cutting blade:Cr12Glazed tile roll forming machine
17. heat treatment of cutting blade:HRC58°-60°
18. thickness of steel coil:0.6-1.2mm
19. tolerance of length:10±2mm
20. transducer: Panasonic
21. computer adopts Panasonic PLC
22. computer operating board adopts Touch screen
23. Voltage: 380V 3 phase 50HZ or at buyer’s requirementroof panel roll forming machine
 
Technical process
Manual decoiler→ feed with guide→ roll forming→ cutting with fixed length→ output with table
 
Equipment Roll forming machine |  
Manual decoiler,main forming machine,hydraulic cutting device,hydraulic station,PLC computer control,output table
 
The time of producing:30days after deposit
Payment : T/T
First deposit T/T 30% when sign the contract, then 70% T/T before delivery
 
Warranty: 1 year and life-long maintainance
*Installation and debugging: We will send professional engineer to make installation and debugging, Buyer pay our engineer each one 50 USD/day, and provide accommodation, food and the round-trip ticket fee.
* Installation Days: about 5-7 days
* Transporting: 1x40ft container
 
 
 
 

------ line --------------------------

Your Name:

Using Right E-mail:

Content:

steel pipe,