Pressure steel tile machine installed in the preparatory work
Pressure steel tile machine installed in the preparatory work
Times colored steel tile machine steel installation in preparation for installation of light steel structure to prepare the basic contents and requirements of the installation of the same with ordinary steel. Steel column base construction, anchor bolts should be doing a good job positioning and protection.
Colored steel tile machine steel installation preparations:
Installation of light steel structure in the preparation of the basic elements and requirements of the installation works the same as ordinary steel. Steel column base construction, positioning and anchor bolts should be good protection, control base and bolt the top level. After foundation construction inspection and acceptance shall be conducted the following:
(2) whether the cross-span design requirements;
(3) based on whether the top level design requirements;
(4) anchor bolt location and elevation is consistent with the design and specifications.
Before the lifting component under "steel construction and acceptance of" the relevant provisions of the testing component of the shape and cross section geometry, the standard deviation exceeds the specified value are not allowed outside; component should be based on the design drawings are numbered, pop-up Install center mark. Steel columns in both directions should be the center of the pop-up tags and elevation marker; marked banding positions; measuring column length, the length of the error should be documented, and oil pen mark in the column next to the bottom center of the plane, to prepare the basis for top surface elevation of the second filling layer adjustment.
Roll former
Components into the construction site, must have quality assurance inspection report and detailed records; should be components of the type, model and installation of piling up the order in designated areas. Component formation skids have enough support to prevent the fulcrum surface subsidence; the same type of component stack, the fulcrum on each component in a straight line; on the deformation of the component should be corrected in time, after passing inspection before installation.