E-mail: btxianfa@gmail.com TEL:0086-317-8267555 FAX: 0086-317-8267570 MOB:0086-15131786129

 
roll forming machine Sitemaps

 

Equipment manual put pressure tile blank, blank check proced

time:2010-07-17 14:55from:未知 Author:admin click:Times

Equipment manual put pressure tile blank, blank check procedure


Equipment manual put pressure tile blank, blank check procedure: the device before use, to check the connection is solid throughout, install bolts and nuts are tightened, so the chassis should add a little lubrication oil to power the machine to start the test, first empty running closer look, with or without vibration, noise, oil window is to oil, whether the coordinated movement of all components, to install all the normal mold, mold installation, you must cut off the power, by hand moving belt or large gear motor, so that Table translocation, and to rise to the highest point of sliding seat, the best support in the table with an object and slide the bottom, with a natural non-slip seat whereabouts of the accident. Pressure W Equipment features: the device has operation, maintenance, maintenance Yi Ji Machine De debugging, die easily, etc. You Dian change; the unit system is automated Kong Zhi Gao 集成 network such that Zi Donghua system Xingneng superior; Gai equipment with high level control software, production information management.
      The mold used in pressure-watt machine on the mold and be a size six, under the same standard model, the first installation module and a lower die, the next model working directly on the six-wheel platform, the module installed on the bottom of the slide , and place the appropriate thickness of plate, to ensure clamping down mode, four evenly around the gap, the distance between the upper and lower die is equal to the required thickness of the tiles. Then subject to the above model, transposition table, pay for installation of the remaining five under the model, all installed to drive for the upper and lower mold after the pressure of tile. Automatic discharge, whichever is blank procedures: mold testing with the installation and the host, and then open the air compressors, vacuum pumps, extruder, Ceva machine, discharge machine, pressure tile machine, the host and moni conveyor, stopping first stop the extruder, and then stop the remaining equipment.

------ line --------------------------

Your Name:

Using Right E-mail:

Content: